Naksha in 2–3 days · from ₹2,999

Updated November 2026

House map approval in West Bengal

In West Bengal the local body passes your house map: in Kolkata the Kolkata Municipal Corporation (KMC) on its own online system, in every other town the municipality or municipal corporation on the state's Online Building Plan Approval System (OBPAS) at obpsudma.wb.gov.in, and in villages the gram panchayat on the Panchayats and Rural Development Department's portal, prdeodb.wb.gov.in. Outside Kolkata a town must decide within 15 days, and outside Kolkata and Howrah a house for your own use up to 10 m high on a plot of up to 200 sq m (about 3 katha), with no basement or deep foundation, is low risk: a Licensed Building Surveyor files the plan, and the plinth and completion checks are self-certified, with no municipal inspection.

WhatsApp

Who passes your map

It depends on the kind of area your plot is in.

Who approves house maps in West Bengal
Your plot is inWho approvesHow
Kolkata (Kolkata Municipal Corporation area)KMC's Building Department, under the Kolkata Municipal Corporation Act 1980 and the KMC Building Rules 2009Online on KMC's building plan system (kmcgov.in) through a Licensed Building Surveyor or architect, with an empanelled structural engineer where needed; the signed deeds, undertakings and soil report follow in hard copy within 3 working days
Howrah (Howrah Municipal Corporation area)The Howrah Municipal Corporation, which applies the KMC Building Rules 2009, relaxed for small plots on 26 August 2022Online on OBPAS for all new buildings since 1 September 2022
Other municipal corporations and municipalities (Siliguri, Asansol, Durgapur, Bidhannagar, Chandernagore and the rest)The municipal body, under the West Bengal Municipal (Building) Rules 2007; in a municipality, a building-plan committee chaired by the chairman, with the executive officer and an engineerOnline on OBPAS, filed by a Licensed Building Surveyor or architect empanelled with that body; the portal lists them by town
Planning area of a development authority (the Kolkata Metropolitan Development Authority, Asansol Durgapur Development Authority, Siliguri Jalpaiguri Development Authority and others)The authority, for development permission under the West Bengal Town and Country (Planning and Development) Act 1979A land use compatibility certificate (LUCC) first, then permission to build, online on the state's eAnumati portal; Siliguri Jalpaiguri Development Authority uses its own LUCC site, and Siliguri's corporation asks for that certificate before it sanctions a plan
Village (gram panchayat area)The gram panchayat, under section 23 of the West Bengal Panchayat Act 1973; the panchayat samiti or zilla parishad checks the plan of a larger or taller buildingOnline on prdeodb.wb.gov.in, which excludes plots under a development authority; the service time limit is 15 days

By plot size and building

These rows apply in municipal bodies under the West Bengal Municipal (Building) Rules 2007, that is, every town except Kolkata and Howrah. The risk classes come from the state's order of 19 February 2020; the state brought it back on 12 September 2023, in place of a November 2022 revision, after a Calcutta High Court order, and we found no newer one by 3 November 2026. No house in a town is exempt from sanction: the low-risk route speeds up the checks, not the approval. Since 12 June 2026 the rules' references to the National Building Code mean the National Building Construction Standards 2026.

West Bengal map approval routes by plot size
Plot or buildingWhat you needConditions
House for your own use, up to 10 m high, on a plot up to 200 sq m (about 3 katha)Low risk: a Licensed Building Surveyor (Class II) prepares and files the plan; after the plinth and on completion you self-certify through that surveyor, and the body issues the plinth certificate within 5 days and the completion certificate within 25, without inspectingNo basement, piles or deep foundation; not in Zone IV of the Vulnerability Atlas of India, on erosion-prone or black cotton soil, or directly next to a railway, metro line, high-tension line, electrical sub-station, canal, coastal zone or water body over 500 sq m (those make it medium risk)
House over 10 m up to 15.5 m, or on a plot of 200 to 500 sq mMedium risk: a Licensed Building Surveyor (Class I) files the plan with written certificates from an empanelled structural engineer and geotechnical engineer, and a soil reportThe plinth and completion checks are certified by a third-party empanelled surveyor who did not design or supervise the house; the body itself does not inspect
House with a basement, piles or deep foundation, over 15.5 m, or on a plot over 500 sq mHigh risk: an architect with an empanelled structural engineer and geotechnical engineerAbove 25.5 m a structural reviewer is also needed
Hill towns such as Darjeeling and KalimpongLow risk only up to 6.5 m on a plot up to 200 sq m; a house over 6.5 m up to 13.5 m, or on a plot of 200 to 500 sq m, is medium riskA building 11.5 m or taller, or with piles, a deep foundation or a basement, needs the state government's prior approval
Small deviation from the sanctioned planCan be regularised by the municipal body on a fee (notification of 4 December 2023)Up to 5% in the dimensions of parts of the house or in covered area, and 10% in overall height, under 3 m extra and no extra floor; the fee is a share of the government registration value of the extra area, from 10% up to 80%

Setbacks for houses

Minimum open spaces in metres for houses in towns outside the hills, Kolkata and Howrah, from rule 50 of the West Bengal Municipal (Building) Rules 2007 as amended on 26 February 2016; the height of the house decides the row. On a plot of up to 65 sq m (about 700 sq ft) with a house up to 8 m high, the rules allow 0.9 m in front and 0.9 m on each side, and any side facing a neighbour's door or window must keep 1.8 m between the buildings. A house may cover 65% of a plot up to 200 sq m, falling evenly to 50% at 500 sq m. In Howrah a plot up to 125 sq m may be covered 70%, with 0.6 m in front.

Setbacks for house plots in West Bengal
PlotFrontRearSides
House up to 7 m high1.2 m2 m1.2 m each
Over 7 m up to 10 m1.2 m3 m1.2 m each
Over 10 m up to 12.5 m1.2 m3 m1.2 m and 1.5 m
Over 12.5 m up to 15.5 m2 m4 m1.5 m and 2.5 m

Common questions on map approval

Where do I apply for house map approval in West Bengal?

It depends on where the plot is. In Kolkata a Licensed Building Surveyor or architect files the plan on KMC's own online building plan system, with an empanelled structural engineer. In Howrah and every other town the plan goes online on the state's Online Building Plan Approval System (OBPAS) at obpsudma.wb.gov.in, filed by a surveyor or architect empanelled with your municipality; you need the deed, mutation record or record of rights, a paid property-tax receipt and the drawings in the portal's format. If the plot lies in a development authority's planning area, you may first need its land use compatibility certificate. In a village you apply to the gram panchayat on prdeodb.wb.gov.in.

Is there a quick route for a small house in West Bengal?

There is no exemption from sanction in towns, but there is a lighter route. Outside Kolkata and Howrah, a house for your own use up to 10 m high on a plot of up to 200 sq m, with no basement, piles or deep foundation and away from railways, high-tension lines, large water bodies and similar hazards, is classed as low risk. A Licensed Building Surveyor (Class II) is enough, and once the plan is sanctioned you self-certify the plinth and the finished house through that surveyor: the municipality must issue the plinth certificate within 5 days and the completion certificate within 25, and does not inspect. It may still check later and cancel a certificate given on false facts.

How long does map approval take in West Bengal, and what does it cost?

Outside Kolkata a municipal body has 15 days to sanction a plan under the state's public-services time limits. Under the West Bengal Municipal Act, if a municipality neither sanctions nor refuses it in time, you can appeal to it in writing, and if the appeal is not decided within 30 days the sanction is deemed granted, though the house must still follow the rules. For a house for your own use the rules set a base fee of ₹500 for the first 30 sq m of floor area and ₹75 for every further 10 sq m, and a municipality may charge up to five times that. In Kolkata the 2026–27 application fee on a plot up to 500 sq m is ₹2,000 for a house up to 7 m and ₹5,000 up to 10 m, with the sanction fee on top. Outside Kolkata a sanction lasts three years and can be renewed for two more; in Kolkata work must start within two years and finish within five.

Who can sign my house plan in West Bengal?

In towns, a Licensed Building Surveyor empanelled with the municipality or an architect registered with the Council of Architecture. A Class II surveyor needs a civil engineering degree and two years' experience, or a diploma in civil engineering or architecture and five years, and is enough for a low-risk house. A Class I surveyor, with a degree and five years or a diploma and ten, files medium-risk houses with certificates from a structural engineer and a geotechnical engineer empanelled with the Municipal Engineering Directorate or KMC. In villages a civil draftsman may sign a house up to 4 m, a surveyor with a civil diploma up to 11 m, a civil engineering graduate up to 15 m, and an architect any building.

How many floors can I build on my plot in a West Bengal town?

The road in front sets the height. On a road wider than 2.4 m and up to 3 m the limit is 7 m; up to 5 m it is 10 m (12.5 m if you give a 2.5 m strip along the frontage to the municipality); up to 7 m it is 12.5 m (15.5 m with the strip); up to 9 m it is 20 m; and wider roads allow 40 m and more. Floor area is capped by road width too, from 1.25 times the plot area on roads of 2.4 to 3.5 m to 1.75 up to 7 m and 2.0 up to 9 m. Outside Kolkata and Howrah, stay within 10 m and a 200 sq m plot for the low-risk route.

Is map approval needed for a house in a West Bengal village?

Yes. Under section 23 of the West Bengal Panchayat Act 1973 no one may build or add to a building in a gram panchayat area without the panchayat's written permission given beforehand, and it cannot approve a plan without a sanitary latrine. The panchayat itself checks a house with up to 150 sq m of plinth area and up to 6.5 m high; the panchayat samiti checks one up to 300 sq m and 6.5 m, the zilla parishad larger or taller ones up to 15 m, and the Panchayats and Rural Development Department anything taller, but the panchayat issues the permission. Only a thatched, tin or tile shed without brick walls, up to 18 sq m, is exempt. Plots under a development authority go to that authority instead.

Are the rules different in Kolkata and Howrah?

Yes. Both follow the KMC Building Rules 2009 rather than the municipal rules used elsewhere. Kolkata runs its own online system, where the surveyor or architect uploads the drawing, KMC scrutinises it and inspects the site, and the sanction follows payment of the fee. In March 2025 KMC proposed easier open spaces and quicker sanction for small plots in colonies, thika land, slums and refugee rehabilitation land; the state notified an amendment to the KMC Building Rules later in 2025, but we could not open it, so check the current limits with KMC's building department. Howrah moved to OBPAS in September 2022 and, since August 2022, lets a house on a plot up to 125 sq m cover 70% of it with 0.6 m in front.

What happens if I build without an approved map in West Bengal?

A municipality can order the work stopped, with police help, and after hearing you can order the unauthorised part demolished at your cost; you can appeal to the court. Building that endangers life or municipal property, blocks water supply, drains or traffic, or creates a fire hazard can bring up to five years in jail and a fine of up to ₹50,000. In Kolkata, KMC says it may complain to the police and demolish. Small deviations, up to 5% in size or 10% in height with no extra floor, can be regularised on a fee. In August 2026 the urban development minister announced third-party checks at each stage of construction and stricter penalties after a window for regularising minor deviations, reported as running to 31 March 2027; we found no notified rule by 3 November 2026.

Sources

West Bengal UD&MA: West Bengal Municipal (Building) Rules 2007, 14 Feb 2007 · Kolkata Gazette: Municipal (Building) Rules amendment (open spaces, heights, surveyors), 26 Feb 2016 · Kolkata Gazette: Municipal (Building) Rules amendment (15 days, plan committee, validity), 19 Feb 2024 · West Bengal UD&MA: risk classification of buildings, 19 Feb 2020 · West Bengal UD&MA: OBPAS reverted to the 2020 risk classification, 12 Sep 2023 · West Bengal UD&MA: self-certification for low and medium risk buildings, 11 Feb 2022 · West Bengal UD&MA: procedure for low-risk self-certification, 23 Jun 2022 · West Bengal UD&MA: Right to Public Services time limits for building plans, 25 Aug 2022 · West Bengal UD&MA: Online Building Plan Approval System (OBPAS) · West Bengal UD&MA: West Bengal Municipal Act 1993, as amended to 2015 · PRS: West Bengal Municipal (Amendment) Bill 2022 (15-day sanction), 16 Nov 2022 · West Bengal UD&MA: Howrah building plans on OBPAS, 25 Aug 2022 · West Bengal UD&MA: building rule relaxations for Howrah, 26 Aug 2022 · West Bengal UD&MA: regularising minor deviations, 4 Dec 2023 · West Bengal UD&MA: circulars and notifications list · KMC: online building plan submission procedure · KMC: building department fees and charges, 2026–27 · KMC: building department FAQ · Millennium Post: KMC drafts small-plot sanction rules, 22 Mar 2025 · West Bengal UD&MA: eAnumati development permission portal · Siliguri Jalpaiguri Development Authority: LUCC and development permission · West Bengal P&RD: building approval portal for gram panchayats · West Bengal P&RD: procedure for building permission in gram panchayat areas, 30 Nov 2020 · PRS: West Bengal Panchayat Act 1973, with amendments to 2026 · Constro Facilitator: minister announces penalties after 31 Mar 2027, 4 Aug 2026

Every fact above comes from these sources; read how we research our guides. Spotted something out of date? Tell us on WhatsApp and we will check it against the source.

Rules change often: we check the current ones for your plot before we draw. See also house plans, the cost calculator and map approval in Uttar Pradesh, Bihar, Delhi, Haryana, Madhya Pradesh, Rajasthan, Tamil Nadu, Gujarat, Jharkhand, Maharashtra, Karnataka, Uttarakhand, Telangana, Kerala, Punjab, Andhra Pradesh and Chhattisgarh.

Get your map drawn for approval

Tell us your plot size, city and budget. A designer calls you back within one working day — the consultation is free.

WhatsApp+91 8920757366