House map approval in Haryana

In Haryana your map is passed by HSVP in its sectors, by the Town and Country Planning Department (DTCP) in licensed colonies and controlled areas, and by the municipality inside town limits, mostly through online portals. Under the Haryana Building Code 2017, a house on a residential plot of any size up to 16.5 m high is low-risk: your architect files the plan under self-certification and you may start building once it is submitted. New stilt-plus-four-floor approvals have been on hold across the state since 21 July 2026.

Who passes your map

It depends on the kind of area your plot is in.

Who approves house maps in Haryana
Your plot is inWho approvesHow
HSVP sector (urban estate)HSVP, through its Estate OfficeOnline on HSVP OBPAS (obpas.hsvphry.org.in), the only route since 1 October 2025: you start the file and pick an architect or supervisor, who prepares and submits it; a Junior Engineer then scrutinises it
Private colony licensed by DTCPThe Town and Country Planning Department (DTCP), through its district officeOnline on HOBPAS (haryanabpas.gov.in) by a registered architect; the system checks the drawing against the Building Code
Town within municipal limitsThe Municipal Corporation, Council or Committee; the Directorate of Urban Local Bodies for change-of-land-use cases and high-risk buildings in extended limitsOnline: DULB lists its OBPAS portal for Model Town, Improvement Trust and similar planned schemes and Saral (saralharyana.gov.in) for the rest, and its approval page links HOBPAS
Controlled area outside town limitsThe Director, Town and Country Planning, under the Controlled Areas Act 1963Apply to DTCP; a new use of the land, such as farmland for a house, needs change-of-land-use permission first; buildings for farming are exempt
Village abadi (lal dora)Not covered by the Controlled Areas Act; the gram panchayat may regulate building in the abadiNo state-wide permit rule found, so ask the gram panchayat; if the village is now inside municipal limits, the municipality approves under the code's core-area rules

By plot size and building

The Haryana Building Code 2017, as amended to 13 August 2026, applies across the state. A TCP memo of 26 June 2026 says occupation certificates through self-certification will start only once the department's online portal is ready; until then the earlier rules apply.

Haryana map approval routes by plot size
Plot or buildingWhat you needConditions
House on a residential plot of any size, up to 16.5 mLow risk: apply under self-certification (Form BRS-I) and start building once it is submittedPlan certified by an architect; the authority can check it at any stage, and violations are fixed at your cost
Any building above 16.5 mHigh risk: full approval on Form BR-IDeemed sanctioned if no order comes within 20 days of a complete application that follows the code, with fees paid
Stilt plus four floors (S+4)New approvals on hold across Haryana since 21 July 2026The High Court stayed the S+4 policy on 2 April 2026; meanwhile a house stays at ground plus three floors within 16.5 m
Homes on one plotOne dwelling unit per floor, at most four per plotBuilding Code note as amended on 13 August 2026, on the competent authority's terms
Plot of 500 sq m or more in the NCRAlso register on the dust portalProof of registration goes with the building plan application

Setbacks for houses

Minimum setbacks for plots outside core areas, from the Building Code, which sets front and rear only; your sector's or colony's zoning plan must be followed too. Ground coverage may be 75% up to 250 sq m and 66% from 250 to 1,000 sq m, and going over it cannot be compounded. Old town cores, including the lal dora of villages inside municipal limits, have their own coverage and setback table.

Setbacks for house plots in Haryana
PlotFrontRearSides
Up to 75 sq m1 m1.5 mNot set
75 to 150 sq m1.5 m2 mNot set
150 to 250 sq m2 m2 mNot set
Above 250 sq m3 m3 mNot set

Common questions on map approval

Where do I apply for house map approval in Haryana?

It depends on who developed your plot. In an HSVP sector you apply on HSVP's OBPAS portal, the only route since 1 October 2025; in a DTCP-licensed colony a registered architect files on HOBPAS; inside municipal limits the municipality approves, through the portals the Urban Local Bodies department lists (OBPAS for planned schemes, Saral for the rest, and HOBPAS). The department's OBPAS address did not open when we checked on 25 and 26 October 2026, so ask the municipal office if a portal is down.

Can I start building as soon as I apply?

Yes, for a house up to 16.5 m high. The Haryana Building Code treats residential plots of every size up to that height as low-risk, so the plan goes in under self-certification, certified by your architect, and construction may start once it is submitted. The authority can still check the plan and the site at any stage: violations must be fixed at your cost, and an architect who certifies wrongly can be reported to the Council of Architecture and blacklisted.

How many floors can I build on a residential plot in Haryana?

Ground plus three floors, within 16.5 m. The code also allows stilt plus four floors within that height, but new S+4 approvals have been on hold across Haryana since 21 July 2026, after the High Court stayed the S+4 policy on 2 April 2026. Under the code as amended on 13 August 2026, a plot may have one home per floor and at most four in all.

Who can sign my house plan in Haryana?

A Council of Architecture-registered architect can prepare and sign plans for any building. A supervisor can prepare, sign and submit plans for buildings up to 200 sq m (8 marla) and 15 m high, and a civil engineer can do the structural drawings for plots up to 1,000 sq m and 15 m. You, the architect and the engineer sign the application digitally.

Is map approval needed for a house in a Haryana village?

It depends on where the house stands. The Controlled Areas Act, which otherwise needs DTCP's permission, does not apply to a village's abadi deh, and the Panchayati Raj Act lets the gram panchayat regulate new buildings in the abadi by general order. Outside the abadi in a controlled area, you need DTCP's permission unless the building is for farming. If the village's lal dora now lies inside municipal limits, the municipality passes the map under the Building Code's core-area rules.

How long does map approval take in Haryana, and what does it cost?

The Building Code gives the authority 20 days: a complete application that follows the code, with all fees paid, is deemed sanctioned if no order is passed in that time. The scrutiny fee is ₹10 per sq m of covered area, and municipalities add development charges where no change of land use is involved. A sanction is valid for two years for buildings under 15 m and five years at 15 m or more; revalidation costs ₹10 per sq m.

What happens if I build without an approved map?

The authority can order you to alter or demolish the building and, if you do not, demolish it at your cost. In a municipal council or committee area, ignoring a demolition order can bring up to six months in jail or a fine of ₹5,000 to ₹10,000, plus ₹100 a day. In a controlled area, building without DTCP's permission can bring up to three years in jail and a fine of ₹10,000 to ₹50,000, plus up to ₹1,000 a day.

Sources

Haryana Building Code 2017, amended to 13 Aug 2026 · TCP Haryana: Building Code amendment, 13 Aug 2026 · TCP Haryana: memo on the 8 Dec 2025 amendment, 26 Jun 2026 · HSVP OBPAS · HSVP: OBPAS launch memo, 28 Sep 2025 · DULB Haryana: approval of building plans · TCP Haryana: HOBPAS user manual · TCP Haryana: Stilt+4 portal and High Court order · The Tribune: S+4 approvals halted, 22 Jul 2026 · Controlled Areas Act 1963 (PRS copy) · Haryana Municipal Act 1973 (PRS copy) · Haryana Municipal Corporation Act 1994 (PRS copy) · Haryana Panchayati Raj Act 1994 (PRS copy)

Rules change often: we check the current ones for your plot before we draw. See also house plans, the cost calculator and map approval in Uttar Pradesh, Bihar, Delhi, Madhya Pradesh and Rajasthan.

Ready to plan your home?