Gorakhpur · Labour contract (theka)
Labour contract (theka) construction in Gorakhpur
In a labour contract (theka) in Gorakhpur, you buy the cement, steel, sand and bricks, and the contractor brings the masons and labour, usually paid stage by stage as the work is finished and measured. The labour rate is quoted after a free site visit and written in your quote, with exactly what is in and out.
Who buys what in a labour contract
In a labour-only contract you buy the material and the contractor brings the team. What the term usually covers:
- You buy: cement, steel, sand, aggregate (gitti) and bricks, and arrange water and electricity at the site.
- The contractor brings: masons, helpers, bar benders and shuttering carpenters, with their hand tools.
- Settle in writing: shuttering plates and props, scaffolding, the concrete mixer and vibrator, curing water and debris removal.
Your written quote lists exactly what is in and out. For how much cement, steel, sand and bricks a house needs, see our materials guide; for a full house with material at a fixed rate instead, see house construction with material in Gorakhpur.
How the work is measured
A labour rate can be fixed for the whole house per sq ft of built-up area, or item by item. Where an item is paid by measured quantity, ask for the measurement to follow IS 1200, BIS's method of measurement, so both sides count the same way:
- Brickwork is measured in cubic metres; walls one brick thick or less are measured in square metres, with the thickness stated (IS 1200 Part 3, clause 4.1).
- Work below and above the ground or datum line is measured separately (Part 3, clause 2.9).
- Plaster is measured in square metres (IS 1200 Part 12, clause 3.6). Openings up to 0.5 sq m are not deducted; an opening of 0.5 to 3 sq m in a wall with the same plaster on both faces is deducted from one face only; a bigger opening is deducted on each face (clause 3.8).
- Dimensions are taken to the nearest 0.01 m.
Stages, payments and site reporting
Pay for stages that are finished and checked, not ahead of the work. The stages follow the order a house is built: foundation and plinth, each slab, brickwork, plaster, then flooring and finishing. Our guide to house construction stages lists what to check at each one. The stages and the payment against each are fixed in your written quote.
Design SQR's client portal shows a project's stage (design, approval, foundation, structure, finishing, handover), the site photos and notes the project manager posts, and the payment schedule with what is paid and what is due. Your quote says whether your contract includes it.
Supervision and quality
Settle in writing who checks the work against the drawings. In many labour contracts a head mason runs the team and no engineer is on site, so the owner checks, or appoints an engineer to. Before every pour, check the steel against the structural drawing, the cover blocks and the shuttering.
UP's 2025 bye-laws ask for building materials that conform to Indian Standards (BIS certified) and for workmanship to Part 7 of the National Building Code 2016 (clause 11.4). In a labour contract you buy the material, so keep the bills and the brand and grade of the cement and steel on record.
No structural drawing yet? Ours include the column layout and footing plan, a column schedule with reinforcement, and the plinth beam and slab drawings; see packages, and the cost calculator for the whole house.
Labour cess: what changed in 2025 and 2026
The Building and Other Construction Workers' Welfare Cess Act, 1996 was repealed from 21 November 2025, when the Code on Social Security, 2020 came into force (notification S.O. 5319(E)). Under the Code:
- Your own house up to fifty lakh rupees: the Code's definition of building or other construction work leaves out work on an individual's own residence whose total cost does not exceed fifty lakh rupees, or a higher amount the government notifies. It also leaves out work employing fewer than ten workers in the preceding twelve months (section 2(6)).
- The rate: where the cess applies, it is one per cent of the cost of construction (notification S.O. 2322(E), 8 May 2026), and the cost does not include the land (section 100).
- When it is paid: the Social Security (Central) Rules, 2026 ask for it in advance, on a self-assessment certified by a chartered engineer. Where the work needs approval from a local authority, the application carries proof of online payment to the State Building Workers' Welfare Board (rule 41).
We have not found a Gorakhpur Development Authority notice on how it applies these rules to house maps, so check when you file; our UP map approval guide covers the map itself. Pages that still quote the 1996 Act are out of date.
Safety on site
The bye-laws ask for safety during construction to follow Part 7 of the National Building Code 2016, and for workers to be adequately qualified, trained, experienced and competent (clause 11.4). On a house, settle in writing who provides helmets and scaffolding, how slab edges and the open staircase are guarded, and who keeps children and visitors off the site.
Common questions
What is a labour contract (theka) in house construction?
It is a contract where you buy all the material and pay the contractor only for labour: masons, helpers, bar benders and shuttering carpenters. The labour rate is set per sq ft of built-up area or item by item. Your written quote lists what the contractor provides, such as shuttering, scaffolding or a mixer, and what you arrange yourself.
Gorakhpur me labour theka ka rate kya hai?
Rate free site visit ke baad quote me likh kar dete hain, kyunki ye naksha, manzil, plot tak pahunch aur kaam ke scope par nirbhar karta hai. Quote me likha hota hai ki rate per sq ft hai ya item ke hisab se, aur shuttering, scaffolding, pani aur bijli kis ki zimmedari hai.
Labour theka me material kaun kharidta hai?
Aap. Labour contract me cement, sariya, ret, gitti aur eent aap khareedte hain, aur thekedar mistri, mazdoor, bar bender aur shuttering karigar laata hai. Shuttering ki plate, ballie, mixer aur curing ka pani kis ki zimmedari hai, ye quote me likha hona chahiye. Material ke bill aur brand record me rakhiye.
Do I have to pay labour cess on my own house in Gorakhpur?
Not if it is your own residence and the total cost of the work does not exceed fifty lakh rupees: the Code on Social Security, 2020 leaves such work out. Where the cess applies it is one per cent of the cost of construction, land excluded, paid in advance, with proof of payment attached where the work needs an approval. The old 1996 Cess Act was repealed from 21 November 2025.
How are brickwork and plaster measured for payment?
By IS 1200, BIS's method of measurement, if your contract adopts it. Brickwork is measured in cubic metres, and walls one brick thick or less in square metres with the thickness stated. Plaster is measured in square metres; openings up to 0.5 sq m are not deducted, and bigger ones are deducted by the rules of IS 1200 Part 12.
Who checks the work in a labour contract?
Whoever the contract names. In many labour contracts a head mason runs the team with no engineer on site, so the owner checks or appoints an engineer. Check the steel, cover blocks and shuttering before every pour, and the line and level of the brickwork. We can provide the structural drawings to check against; your quote says whether site supervision and our client portal are included.
Sources
Code on Social Security, 2020: sections 2(6), 100 and 164 (PRS copy) · Gazette, S.O. 5319(E), 21 Nov 2025: Code in force · Gazette, S.O. 2322(E), 8 May 2026: cess at one per cent · Social Security (Central) Rules, 2026: rule 41 (PRS copy) · BIS, IS 1200 (Part 3):1976, brickwork · BIS, IS 1200 (Part 12):1976, plastering · UP Model Building Bye-laws 2025 (GDA Ghaziabad copy)