Raw house (grey structure) construction in Gorakhpur

A raw house, or grey structure, usually means the frame and shell of a house: foundation, columns, beams, slabs, staircase and brick walls, without plaster, flooring or fittings. Gorakhpur is in earthquake Zone IV, so that frame has to follow the ductile detailing of IS 13920 from a structural drawing; the rate is quoted after a free site visit and written in your quote.

WhatsApp

What a grey structure usually includes

The term has no fixed legal meaning, so your written quote lists exactly what is in and out. Usually:

  • Included: excavation, footings, the plinth beam, columns, beams and slabs on every floor, the staircase, brick walls, lintels and chhajjas.
  • Agree in writing: electrical conduits and fan boxes in the slabs, plumbing sleeves through beams and walls, the mumty (stair room) and the parapet.
  • Usually left for finishing: plaster, flooring and tiles, doors and windows, wiring, sanitary fittings and paint.

Conduits and sleeves go in before the concrete is cast, so fix the electrical and plumbing layout first; see planning wiring before construction. Before the excavation, the map has to be approved or registered; see our UP map approval guide.

Why the structural drawing matters in Gorakhpur

Gorakhpur is listed in Zone IV, zone factor 0.24, in Annex E of IS 1893 (Part 1):2016. IS 13920:2016 applies to the earthquake-resisting frame of every reinforced concrete building in Zones III, IV and V (clause 1.1.1), and its detailing lives in the structural drawing, not in a thumb rule. UP's 2025 bye-laws also ask for the structural design to be done by a registered or licensed engineer or structural engineer (clause 11.1). More in our earthquake-resistant house guide.

Two IS 13920 rules you can see on site:

  • Column laps: bars may be lapped only in the central half of the column's clear height, never within a joint, with closed links no more than 100 mm apart over the lap and no more than half the steel area lapped at one section (clause 7.3.2.1).
  • Beam laps: not within a joint or within twice the beam's effective depth from the column face, with closed links no more than 150 mm apart over the lap (clause 6.2.6.1).

Concrete cover: check it before every pour

Cover is the concrete between the steel and the outside surface; it keeps the steel from rusting. IS 456:2000 sets the minimum nominal cover:

  • Footings: 50 mm (clause 26.4.2.2).
  • Main bars in a column: 40 mm, and not less than the bar's diameter (clause 26.4.2.1).
  • Other members, by exposure (Table 16): 20 mm where the concrete is protected from the weather (15 mm for main bars up to 12 mm), 30 mm where it faces rain or is buried in non-aggressive soil, and more for severe exposure; the structural drawing states the cover for each member.
  • Tolerance: the actual cover may be up to 10 mm more than specified, never less; cover blocks of concrete as strong as the member, or PVC, no more than 1 m apart (clause 12.3.2).
  • Bar bending schedule: IS 456 asks for one for all reinforcement work (clause 12.1).

Curing, and finishing later

Curing and the time before the formwork and props come off decide the strength of every slab; the IS 456 minimums are in our guides to construction stages and how long a house takes to build. Finishing can follow later, but plan it now:

  • Keep the floor levels, door heights and window openings from the drawing, so frames and flooring fit when finishing starts.
  • Protect bars left for a future floor from rust; IS 456 says high-strength deformed bars should not be re-bent or straightened without the engineer's approval (clause 12.1).
  • Get the finished frame checked against the structural drawing before plaster hides it.

For the whole house built with material at a fixed rate per sq ft, see house construction in Gorakhpur, our packages and the cost calculator; for the finishing inside, interior design in Gorakhpur.

Common questions

What is included in a grey structure?

Usually the foundation, plinth beam, columns, beams, slabs, staircase and brick walls, with lintels and chhajjas: the frame and shell of the house without plaster, flooring, doors, windows, wiring or paint. The term has no fixed legal meaning, so your written quote should list every item that is in and out, including conduits, sleeves, the mumty and the parapet.

Gorakhpur me ghar ka dhancha banane ka rate kya hai?

Rate free site visit ke baad quote me likh kar dete hain. Ye manzil, slab ki sankhya, neev ki gehraai aur kaam ke scope par nirbhar karta hai. Pura ghar material aur finishing ke saath fixed rate par chahiye to hamara Gorakhpur house construction page aur Packages page dekhiye, jahan package rate likhe hain.

Which earthquake zone is Gorakhpur in?

Zone IV, with a zone factor of 0.24, in Annex E of IS 1893 (Part 1):2016, the code in force. IS 13920:2016 therefore applies to the reinforced concrete frame of a house there, single storey or not: closed links with 135° hooks, closer links near joints and bar laps only where the code allows them. A page that puts Gorakhpur in Zone VI is out of date.

How much concrete cover should the steel have?

At least 50 mm in footings and 40 mm for the main bars of a column, under IS 456:2000. Elsewhere it depends on exposure: 20 mm where the concrete is protected from the weather and 30 mm where it faces rain or sits in non-aggressive soil. The actual cover may exceed the specified cover by up to 10 mm, but never fall short of it.

Can I do the finishing later with another contractor?

Yes. Finishing can follow later, but fix the electrical and plumbing layout before the slabs are cast, keep the floor levels and openings from the drawing, and have the completed frame checked against the structural drawing before plaster covers it. Our house construction and interior design pages for Gorakhpur cover the finishing stage.

Dhancha banne ke baad curing kitne din karni chahiye?

IS 456:2000 ke hisab se concrete ko kam se kam 7 din lagatar geela rakhna hai (ordinary Portland cement), aur blended cement ya garam, sookhe mausam me kam se kam 10 din. Shuttering aur props hatane ka samay span par nirbhar karta hai; poora vivaran hamare construction stages guide me hai.

Sources

BIS, IS 1893 (Part 1):2016, Annex E · BIS, IS 13920:2016, ductile detailing · BIS, IS 456:2000, plain and reinforced concrete · UP Model Building Bye-laws 2025 (GDA Ghaziabad copy)

Raw house (grey structure) construction in Gorakhpur: talk to us

Tell us your plot size, city and budget. A designer calls you back within one working day — the consultation is free.