Checked against CEA 2023, NBC and NEC · 23 November 2026
Smart home wiring for a new house in India
Before the slab is cast, a smart home needs a neutral wire at every switchboard, a 30 mA RCCB (CEA Safety Regulations 2023, regulation 44), 1.5 sq mm lighting and 2.5 sq mm power circuits with 20% left for later, a spare conduit between floors, a Cat 6A cable to each floor and its own point for every motorised curtain, geyser and EV charger. A State-licensed electrical contractor does the wiring.
What the law asks of any house wiring
- The CEA Safety Regulations 2023 make the National Electrical Code and the National Building Code the standards to follow, and the materials used must conform to the relevant Indian Standards. (CEA 2023, reg. 14(2) and 14(3))
- In a domestic installation the residual current device must have a residual operating current not exceeding 30 mA. (CEA 2023, reg. 44)
- Wiring work, including additions and alterations, may only be done by an electrical contractor licensed by the State, under the direct supervision of a certificate-of-competency holder and by a permit holder. Replacing lamps, fans, fuses, switches and appliances up to 250 V is the exception. (CEA 2023, reg. 31(1))
- Before supply starts, the owner inspects, tests and self-certifies the installation and sends the report to the Electrical Inspector in the Schedule II form. (CEA 2023, reg. 45(1)(a))
- BIS established SP 7:2026, the National Building Construction Standards 2026, on 30 April 2026 and withdrew the National Building Code 2016 the same day. The electrical section is now Part D Section 2 and is sold by BIS, so the figures on this page are from NBC 2016 and NEC 2011, the public editions. (BIS Gazette notification, 30 April 2026; NBCS 2026 Part F cl. 3.5.5.1)
- The wiring code is IS 732:2019 (fourth revision), also paid. NBC 2016 says its electrical section is largely based on IS 732:1989, the public edition quoted here. (BIS listing of IS 18732:2023; NBC 2016 Part 8 Sec 2 foreword)
Circuits, RCCB, heights and conduits
Smart switches go on the same circuits as ordinary ones, so these rules decide where the modules sit and how much load each can take.
| What | The rule | Source |
|---|---|---|
| Lighting and fan circuit | Not more than ten points of lights, fans and 6 A sockets on a sub-circuit, 800 W, in 1.5 sq mm copper; at least two lighting sub-circuits per house, and a separate one for the outside lights. | NBC 2016 cl. 5.4.4.3; NEC 2011 cl. 6.1.7 |
| Power circuit | 2.5 sq mm copper at least; not more than two 16 A outlets on a sub-circuit, which can be wired in 4 sq mm; power kept separate from lighting and fans. | NBC 2016 cl. 5.4.4.3; NEC 2011 cl. 6.1.5 |
| Room to grow | No sub-circuit above 3,000 W; a new installation is designed at about 2,500 W so that 20% is left for what is added later, such as an AC or an EV charger. | NBC 2016 cl. 5.4.4.7 |
| RCCB | 30 mA in a domestic installation (CEA); NBC puts a 30 mA RCCB at the distribution-board incomer of a residential building; NEC puts 300/500 mA at the building entry and 30 mA at each sub-distribution board. | CEA 2023 reg. 44; NBC 2016 cl. 5.4; NEC 2011 cl. 4.13 |
| Geyser and heavy loads | An instant geyser is wired from a 100 mA RCCB circuit, because 30 mA may trip for nothing; any load above 1 kW gets its own isolator switch or MCB. | NBC 2016 cl. 13.4.3; NEC 2011 cl. 6.1.8 |
| Surge protection | Main and branch distribution boards carry a surge protective device and an earth-leakage device on the incomer; the device standard is IS 16463 (Part 11), identical to IEC 61643-11. | NEC 2011 cl. 5.1.1.1; BIS listing of IS 16463 |
| Heights | A switchboard's bottom is not within 1.25 m of the floor unless its front is enclosed by a door; no socket within 1 m of the floor in a kitchen, bathroom, toilet or garage; kitchen sockets 150 mm above the counter and within 1 m of any part of it, none above the gas stove. | NEC 2011 cl. 7.1.7 and 14; NBC 2016 cl. 5.8.4 and 13.4.3 |
| Conduits | At least one extra conduit from each floor's distribution board to the next; conduit colours: power black, security blue, fire alarm red, low voltage brown, UPS green. | NEC 2011 cl. 13.3.5.5; NBC 2016 Part 8 Sec 2 |
| Cables per conduit | 1.5 sq mm: 4 in 16 mm, 6 in 20 mm, 10 in 25 mm, 14 in 32 mm; 2.5 sq mm: 3, 5, 10, 14; 4 sq mm: 2, 3, 6, 10. | IS 732:1989 Table 7 |
| Above a false ceiling | Any 230 V wiring for lighting or other services above a false ceiling should have 660 V grade insulation. | NBCS 2026 Part F cl. 3.5.5.1 |
How many sockets and points per room
NBC 2016's recommended socket-outlets for a house, and NEC 2011's points by floor area. A smart home adds modules behind these points, not extra circuits.
| Room | 6 A sockets | 16 A sockets |
|---|---|---|
| Bedroom | 2 to 6 | 2 |
| Living room | 2 to 4 | 2 |
| Kitchen | 2 to 8 | 2 |
| Dining room | 2 to 4 | 2 |
| Garage | 1 | 1 |
| Refrigerator | — | 1 |
| Air conditioner | — | 1 for each |
| Floor area | Light points | Fan points | 6 A | 16 A |
|---|---|---|---|---|
| 35 sq m (377 sq ft) | 7 | 2 | 2 | — |
| 45 sq m (484 sq ft) | 8 | 3 | 3 | 1 |
| 55 sq m (592 sq ft) | 10 | 4 | 4 | 2 |
| 85 sq m (915 sq ft) | 12 | 5 | 5 | 3 |
| 140 sq m (1,507 sq ft) | 17 | 7 | 7 | 4 |
These are minimums for an ordinary house. Where the TV, the bed, the desk and the curtains go decides the real count, which is why we fix the switchboards on the furniture layout of the electrical design.
What smart switches need: neutral, load and room in the box
- Schneider's Wiser 16 A connected switch lists the neutral conductor as mandatory: line and load in 2.5 sq mm, neutral in 1.5 sq mm, up to 3,000 W resistive (geyser, AC, lamps), Wi-Fi 2.4 GHz only, one module, no hub. (Schneider Wiser India, 16 A connected switch guide)
- Legrand's connected switch with neutral (two 1.5 sq mm wires, neutral blue) needs a starter pack or gateway; its switch without neutral needs a bleeder (ref. 040149) every time, LEDs over 5 W, and is limited to 125 W. (Legrand sheets LE17062AA and LE13856AA)
- Philips Hue's wired wall switch module requires a neutral wire and a Hue Bridge; its wired dimmer works without a neutral but the light is less bright and some LED bulbs may need a bypass capacitor. Make sure there is enough room in the box for the module. (Philips Hue support, wall switch modules)
- Sonoff's ZBMINIL2 works with no neutral, through a Zigbee 3.0 hub, at 6 A; it is not for inductive loads such as fans, and measures 39.5 × 32 × 18.4 mm. (Sonoff ZBMINIL2 user manual)
- Shelly's 1 Mini Gen3 sits behind an ordinary switch at 29 × 34 × 16 mm, needs live and neutral, switches 8 A (2,000 W) over Wi-Fi and Bluetooth with no hub. (Shelly 1 Mini Gen3 documentation)
- Plugs and sockets follow IS 1293:2019 (up to 250 V and 16 A, with or without shutters and insulated pins); the 6 A and 16 A pairing in the tables above is NEC's and NBC's. (BIS product manual for IS 1293:2019)
Wi-Fi, Zigbee, Matter, Thread or KNX
- Matter 1.6 (17 June 2026) adds setup over NFC and Joint Fabric, where several controllers co-administer one network; the path from specification to products varies by company. Matter runs today across Apple Home, Google Home, Amazon Alexa, Samsung SmartThings and Home Assistant. (CSA, Matter 1.6 release and Matter page)
- Matter is a local technology: Matter-only devices need an internet-connected controller in the house, such as a smart speaker or hub, for control from outside the home. (CSA, Matter FAQ)
- Thread devices reach Wi-Fi and Ethernet through a border router; in practice one is required for most uses, and some are built into Wi-Fi routers and home gateways. (Thread Group, border router white paper, July 2022)
- KNX is a wired bus: 0.8 mm solid-core wires, devices at 21–30 V DC, at most 350 m from the power supply to a device and 1,000 m of cable in a segment; the cable is a screened J-Y(ST)Y 2×2×0.8 with a green sheath, not for power. (KNX Association; Lapp cable sheet)
- Wi-Fi 7 (Wi-Fi CERTIFIED 7, 8 January 2024) brings 320 MHz channels where the 6 GHz band is open, multi-link operation and 4K QAM, and stays backward compatible, so a Wi-Fi 7 router serves the older switches too. (Wi-Fi Alliance)
Only KNX needs its own cable in the walls; the wireless systems need a neutral, room in the box and good Wi-Fi on every floor. Which assistant speaks Hindi, and what to do when the internet goes, is in our smart home ideas room by room.
Pre-wiring checklist: lay these before the slab
- A neutral at every switchboard, and the box depth from the switch maker's sheet before the boxes are cast in: the behind-switch modules above are 16 to 18.4 mm deep. (Schneider, Shelly and Sonoff sheets)
- One Cat 6A cable from the internet entry to each floor and to the rooms with a TV or a desk: Cat 6A carries 10 Gigabit Ethernet to 100 m and is the recommendation for new installations. (CommScope, Cat 6A)
- A ceiling point per floor for a Wi-Fi access point: one RJ45 fed by 802.3af PoE powers it over the same cable, so no 230 V point is needed there. (TP-Link EAP610 v4 datasheet)
- At the window of every motorised curtain: a 230 V 50 Hz point, the cable fixed away from moving parts and left accessible so it can be replaced, the motor at least 1.5 m high. (Somfy Glydea Ultra RTS instructions)
- For an EV charging point: the socket at least 800 mm above finished ground; its own dedicated sub-circuit with an overcurrent device on a switchboard; no extension cord, adaptor or portable socket; and the RCD tests the maker specifies. (CEA 2023, reg. 124, 125 and 127)
- The Ministry of Power's 2024 guidelines cover charging infrastructure in private parking spaces and make it a de-licensed activity; the charger's kW is not fixed by them. (MoP guidelines 2024 (MNRE policy update))
- Inverter and UPS circuits: protective devices (MCB, RCCB) on both the incoming and the outgoing side, proper earthing, the load within the inverter's capacity, and the inverter-fed circuits marked so nobody assumes they are dead. (NBC 2016 cl. 10.4.3 and 10.4.4)
- Facilities for telephone wiring are to be provided in every house where telephones are likely; kitchen power outlets preferably in metallic conduit; the fan's lowest point at least 2.4 m above the floor. (NEC 2011 cl. 14 and 14.1)
- Occupancy sensors, light sensors, master switches and light automation are the energy-saving switching systems NBC names for lighting circuits, and a building automation system may control HVAC, electrical, plumbing and low-voltage systems. (NBC 2016 Part 8 Sec 2, cl. 10.5 and energy conservation list)
The planning steps, the scenes and the security basics are in our post on smart home planning before construction (in Hinglish: smart ghar kaise banaye).
Where the sources say nothing, or are not public
- IS 732:2019 and NBCS 2026 Part D Section 2 are sold by BIS, so the clauses here are from IS 732:1989, NBC 2016 and NEC 2011; a figure may have changed in the current editions.
- No standard or switch maker we read gives a number for the depth of a modular box; only the module sizes are published, so the depth is specified per switch model.
- No rule asks for a draw string in a spare conduit; we specify one in every spare pipe anyway.
- No standard asks for a separate circuit for the hub, router or automation gateway; we put them on the inverter circuit so scenes keep working in a power cut.
- Whether CEA regulations 123–127 on charging stations apply to a private home charger is not defined, and the 2024 guidelines do not fix a home charger's kW or RCD type.
- We found no official rule for CCTV or video-door-phone cabling; we draw a network cable and a power point to each camera and the door station.
What we draw
Our smart home and home automation service marks every switch, sensor, camera, speaker and Wi-Fi point on the electrical drawings of each floor, with the conduit routes planned before the slab and the scenes you choose. It is done from your drawings, so it works anywhere in India. See also our luxury house designs, the construction cost calculator and our prices.
Common questions
Do smart switches need a neutral wire at the switchboard?
Most do. Schneider's Wiser 16 A connected switch lists the neutral as mandatory, with 2.5 sq mm line and load and 1.5 sq mm neutral; Legrand's switch without a neutral needs a bleeder and stops at 125 W; Philips Hue says a dimmer without a neutral is less bright and may need a bypass capacitor. In a new house the neutral is one extra wire per board, so we draw it to every switchboard.
Smart home ki wiring me neutral wire kyon chahiye?
Smart switch ke andar ek relay aur Wi-Fi ya Zigbee module hota hai jo light band hone par bhi chalu rehta hai, aur use chalane ke liye phase ke saath neutral chahiye. Purani wiring me board tak sirf phase aur switched wire aate hain, isliye wahan no-neutral switch ya bleeder lagana padta hai, jo sirf halke LED load ke liye hai: Legrand 125 W tak. Naye ghar me har board tak neutral daalna sabse sasta hal hai.
What should be in the walls before the slab for a smart home in a new house?
Conduit to every switchboard with a neutral; a spare conduit from each floor's distribution board to the next, as NEC asks; a Cat 6A cable from the internet entry to each floor and a ceiling point for a PoE access point; a 230 V point at every motorised curtain; power and a network cable at the gate for the video door phone and camera; a conduit to the roof for solar and to the parking for an EV point; and the hub and router on the inverter circuit.
RCCB kitne mA ka lagana chahiye ghar me?
CEA Safety Regulations 2023, regulation 44: domestic installation me 30 mA se zyada ka RCD nahi. NBC 2016 residential building ke distribution board incomer par 30 mA RCCB kehta hai, aur NEC 2011 building entry par 300/500 mA aur har sub-DB par 30 mA. Instant geyser ke liye NBC 100 mA ka alag circuit kehta hai, kyunki 30 mA par geyser nuisance tripping kar sakta hai. Kitchen ke sab socket 30 mA circuit par hon.
Which internet cable should go in the walls: Cat 6 or Cat 6A?
Cat 6A. CommScope's note on the standard says it carries 10 Gigabit Ethernet to 100 m and is recommended for new installations. A ceiling access point such as TP-Link's EAP610 is powered over that same cable by 802.3af PoE, so one cable per floor gives both network and power. Run it in its own conduit, brown in NBC's colour code for low voltage, never in the power conduit.
Matter, Zigbee, Wi-Fi ya KNX: naye ghar me kaun sa system sahi hai?
Wi-Fi switches (Schneider Wiser 16 A, Shelly) need no hub but every device sits on the router; Zigbee ones (Sonoff, Hue, Legrand) need a hub or bridge and leave the Wi-Fi free; Matter 1.6 (June 2026) is the common language across Apple Home, Google Home, Alexa and SmartThings, and Thread devices need a border router; KNX is a wired bus on a green 2×2×0.8 mm cable at 21–30 V DC, laid in its own conduits, so it is the one to decide before the slab.
EV charger ka point ghar me kaise lagwayen?
CEA 2023, regulations 124 and 125: socket finished ground se kam se kam 800 mm upar; apna dedicated sub-circuit, jiska overcurrent device switchboard par ho; koi extension cord, adaptor ya portable socket nahi; aur maker ke bataye RCD test (regulation 127). Charger ka kW niyam me tay nahi hai, isliye hum drawing me DB se parking tak khali conduit aur charger ka point rakhte hain; rating charger aane par tay hoti hai.
Does a smart home still work in a power cut or when the internet goes?
The lights and scenes do if the router, the hub and those circuits are on the inverter. NBC 2016 clause 10.4 asks for protection on both sides of the inverter, earthing, a load within its capacity, and marking of the inverter-fed circuits (green conduit in NBC's colour code). Matter is local, so devices answer a controller inside the house without internet; control from outside the house needs the internet back.
Kya purane ghar me bina neutral ke smart switch lag sakta hai?
Haan, lekin seemit load ke liye. Legrand ka without-neutral switch bleeder ke saath 125 W tak chalta hai, LED 5 W se upar; Sonoff ZBMINIL2 bina neutral chalta hai par Zigbee hub chahiye aur pankhe jaise inductive load par nahi; Philips Hue ka battery module bina neutral ke Hue Bridge ke saath. Geyser aur AC jaise bhari load ke liye neutral wala 16 A switch chahiye, jaise Schneider Wiser 3,000 W tak.
स्मार्ट होम वायरिंग: एक नज़र में
नए घर में स्मार्ट होम की वायरिंग स्लैब डलने से पहले तय होती है: हर स्विच बोर्ड तक न्यूट्रल तार, मॉड्यूल के लिए गहरा बॉक्स, डिस्ट्रीब्यूशन बोर्ड पर 30 mA का RCCB (CEA सुरक्षा नियम 2023, नियम 44), लाइट के लिए 1.5 वर्ग मिमी और पावर के लिए 2.5 वर्ग मिमी तांबे का तार, हर मंज़िल तक एक खाली कंड्यूट और एक Cat 6A केबल, और पर्दे की मोटर, गीज़र, इन्वर्टर और EV चार्जर के लिए अलग पॉइंट। वायरिंग सिर्फ़ राज्य का लाइसेंस रखने वाला ठेकेदार करे (नियम 31)। हम यह सब आपकी इलेक्ट्रिकल ड्रॉइंग पर निशान लगाकर देते हैं।
Sources, read on 23 November 2026
CEA (Measures relating to Safety and Electric Supply) Regulations 2023, Gazette of 8 June 2023 (KSEB copy) · National Building Code of India 2016, Volume 2, Part 8 Section 2 (Internet Archive copy) · National Electrical Code of India, SP 30:2011 (public scan) · IS 732:1989, code of practice for electrical wiring installations (public scan) · BIS Gazette notification of 30 April 2026: SP 7:2026 established, SP 7:2016 withdrawn · NBCS 2026 (SP 7:2026) Part F, fire and life safety (Goa DFES copy) · BIS: IS 18732:2023, guide for implementation of electrical installation standards (cross-references IS 732:2019) · BIS: IS 16463 (Part 11):2016, low-voltage surge protective devices · BIS product manual for IS 1293:2019, plugs and socket-outlets, January 2021 · Schneider Electric: Wiser India 16 A connected switch, device user guide · Legrand: connected switch with neutral, instruction sheet LE17062AA · Legrand: connected switch without neutral, instruction sheet LE13856AA · Philips Hue support: wall switch modules · Sonoff ZBMINIL2 Zigbee switch, user manual (retailer copy) · Shelly 1 Mini Gen3, documentation · Connectivity Standards Alliance: Matter 1.6 press release, 17 June 2026 · Connectivity Standards Alliance: Matter · Connectivity Standards Alliance: Matter FAQ · Thread Group: Thread Border Router white paper, July 2022 · KNX Association: KNX twisted pair, 5 December 2018 · Lapp: UNITRONIC BUS EIB 2×2×0.8 cable, product information · Wi-Fi Alliance: Wi-Fi CERTIFIED 7, 8 January 2024 · CommScope: Cat 6A · TP-Link: EAP610 v4 ceiling access point datasheet, June 2025 · Somfy: Glydea Ultra RTS curtain motor instructions · MNRE policy update, September 2024: MoP guidelines for EV charging infrastructure 2024
Design SQR draws the plan; a State-licensed electrical contractor does the wiring, and the owner self-certifies it before supply. Brands are named only because their published sheets state what the wiring must give them; we sell none of them. How we research our guides.
Get every smart point drawn before the slab
Send your floor plan, or your plot size and floors, and the rooms you want smart: a designer calls you back within one working day.